Homepage / Fill in a Valid K Electric New Connection Template
Jump Links

The K Electric New Connection form is an essential document for individuals and businesses seeking an electricity service connection through the Karachi Electric Supply Company Limited (KESC). It serves as the official application under the NEPRA Act of 1997. This form requires the applicant to provide personal information, including the owner's name, CNIC number, occupation, and contact details, ensuring that KESC has accurate data for processing the request. Additionally, applicants must specify the connection details, indicating whether the premises are residential, commercial, or industrial, among other classifications. Different connection types, such as single-phase or three-phase, need to be selected based on the requirements. The form outlines the necessary documentation that must accompany the application, such as proof of ownership and building plans, ensuring all submissions are compliant with KESC guidelines. Applicants will also find a section dedicated to the customer's declaration, where they agree to pay applicable charges and acknowledge the regulations governing their service. This introduction serves to guide potential applicants through the process while assuring them that the form is accessible and free of cost, with payments only processed through authorized KESC banks.

K Electric New Connection Example

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

Application Form for Electricity Service Connection

UNDER NEPRA ACT 1997 (ACT XL OF 1997)

 



1997

Paste Photograph

Here

Owner’s Name

Owner’s Profile

Father’s/Husband’s Name

/

CNIC Number with Validity



Profession/Occupation

/

Address of Correspondence

Phone Residence

Phone Office

Mobile Number

 



 

Email Address

National Tax No. (If applicable)



GST No. (If applicable)



Contact Person Profile (Optional)

Name of Contact Person

Father’s/Husband’s Name

 

/

 

CNIC Number with validity



 

Phone (any)



 

To be filled by the Owner in CAPITAL LETTERS

(This form is Free of cost, all payments shall be made at KESC's authorized banks only)

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

Application Form for Electricity Service Connection

UNDER NEPRA ACT 1997 (ACT XL OF 1997)

 



1997

Connection Details

Address where Connection is required



Existing/Nearest Energy Meter Number

/Ž

Type of Premises

 

Residential

Commercial

Industrial

Agriculture

(Please tick mark)

 

 

 

 

 

 

 

 

 

 

 

 

Type of Connection

Single Phase

Three Phase

Underground Overhead

(Please tick mark)

 



 

 

 

 

 

 

 

 

New Connection

 

Load Extension

 

 

Reinforcement

 



(1 to 3 Phase)

 

 

 

3

1

Nature of Services

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Please tick mark)

 

 

 

 

 

 

 

 

Temporary Connection



Separate/Tapping

 

Change of Meter

 

 

 

Meter

/

Position

 

 

 

 

 

 

 

 

Load & Area Requirement

 

 

Multi Stored Projects

 

Type of Units

Size (Sq.Ft/Yds)

Quantity

Load Required (KW)

Total Load Required

 

/

KW

Flats

 

 

 

 

Flats

 

 

 

 

Flats

 

 

 

 

Shop

 

 

 

 

Shop

 

 

 

 

 

 

 

 

Shop

 

 

 

 

 

 

 

 

Water Pump

 

 

 

 

Others

 

 

 

 

 

 

Bungalow / House / School

/ /

 

Type of Units

 

Size (Sq.Ft/Yds)

/

Quantity

Load Required (KW)

KW

Total Load Required

Agricultural / Farms / Industry / CNG / Petrol Pump & Others / // /

Details

Size (Sq Ft/Yds of Plot

/

Load Required (KW)

KW

Total Load Required

Others

 

To be filled by the Owner in CAPITAL LETTERS

(This form is Free of cost, all payments shall be made at KESC's authorized banks only)

THE KARACHI ELECTRIC SUPPLY COMPANY LIMITED

Application Form for Electricity Service Connection

UNDER NEPRA ACT 1997 (ACT XL OF 1997)

 



1997

 

 

 

Customer’s Declaration

 

 

 

 

I/We full agree to pay the charges as per tariff (which shall be enforced from time to time) and all services related charges including Security Deposit, System development charges and other payments (if any) as per approved terms and conditions. I/We hereby agree to abide by all the rules & regulations of KESC and verify that all details and documents are authentic.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ž ā÷ /

/

 

Ž

 

 

÷ ÷

 

 

 

 

 

÷ ÷

 

 

 

 

 

 

 

 

 

ā

 

 

 

 

÷

÷

 

 

 

 

÷

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Signature of Owner with date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

List of Documents to be submitted with this Application form

1.Copy of CNIC of the owner

2.Passport size photograph of applicant (Residential/Commercial/Agriculture connection)

3.Copy of Registered Ownership documents.

4.Copy of approved building plan (in case of MS Building).

5.Copy of covering letter of approved plan/layout.

6.In case of Kachi Abadies, Affidavit for Kachi Abadi.

7.Copy of Trade License (if applicable).

8.Copy of last paid Energy bill (only in case of extension of load).

9.Authority letter of owner (if applicable).

10.List of machinery/Equipments in case of Industrial cases.

11.Details of Chiller units (in case of Centrally Air-Conditioned Premises).

12.Feasibility Report of Industry (in case of Industrial Consumers).

13.Copy of any other paid utility bill/credit card bill for the address verification in case of (Residential/Commercial/Agriculture connection). In case of industrial connection, company letter head mentioning the name of authorized contact person, his contact details, copy of CNIC with authorized stamp shall be submitted with application

14.Undertaking for Deviation from approved building plan (in case of deviation)

15.All Original documents shall be presented with photocopies at time of submitting the application for verification purpose.

For Submission of Applications please contact us at following Offices

 

 

 

For Industrial, Residential, Commercial &

For Residential, Commercial & Agricultural Connection

Agricultural Connections

 

 

 

 

Civic Center: Ground Floor, KESC Block

T ipu Sultan Center: P #: F-8/23-B, KESC Office JCHS,

 

 

 

Block 7/8, PECHS, T ipu Sultan Rd.

 

 

 

 

 

 

7/8JCHS KESCF-8/23-B

Korangi Centre: Plot No. ST-3, Sector-22,

PECHS

 

 

 

 

Near Jam Sadiq Bridge (KPT Flyover), Korangi Industrial Area, Karachi.

Shah Faisal Center: Shop No. 5 Falaknaz Pride opp.

 

 

 

 

 

 

 

 

Airport Police Station Main Shahrah-e-Faisal Shah Faisal

 

 

SITE Center: E-1,State Avenue near Siemens Chowrangi , SITE Karachi.

Nazimabad Center: KESC Hadi Market Center, IV-C-6, Commercial Area,

Adjacent Abdullah Floor Mill, Naz. # 4, Karachi

 

 

 

 

 

 

 

 

 

 

ā E-1

IV-C-6 KESC

 

 

 

 

4

For information please call us at 118 or write to us at [email protected]

NOTE: KESC may, at its option, use the Security deposit for the purpose of self-utilization by KESC from time to time and shall upon discontinuation of electric supply to the consumer adjust/return the Security deposit as the case may be as per applicable NEPRA notification

To be filled by the Owner in CAPITAL LETTERS

(This form is Free of cost, all payments shall be made at KESC's authorized banks only)

File Breakdown

Fact Name Description
Form Purpose This form is used to apply for a new electricity service connection with K Electric in Karachi, Pakistan.
Governing Law The application is regulated under the National Electric Power Regulatory Authority (NEPRA) Act of 1997.
Free of Cost Applicants should know that this form is provided free of charge; however, payments must be made at authorized banks only.
Required Documents Several documents must accompany the application, including a copy of the CNIC, ownership documents, and a registered building plan.
Connection Details Applicants have to specify the type of service connection needed, including options like residential, commercial, or industrial.
Customer's Declaration By signing the application, the customer agrees to pay all associated charges and adhere to K Electric's rules and regulations.

Guide to Using K Electric New Connection

After completing the K Electric New Connection form, ensure that all required documents are gathered for submission. The completed form, along with the necessary documents, needs to be presented at the designated KESC office.

  1. Obtain the K Electric New Connection form.
  2. Fill in the Owner’s Name in capital letters.
  3. Provide the Owner’s Profile, including Father’s/Husband’s Name and CNIC Number with Validity.
  4. Include the Profession/Occupation and address of correspondence.
  5. Enter the phone numbers: Residence, Office, and Mobile Number.
  6. Add the Email Address.
  7. If applicable, fill in the National Tax No. and GST No.
  8. If desired, fill out the Contact Person Profile, including their details.
  9. Indicate the Address where the connection is required.
  10. Provide the Existing/Nearest Energy Meter Number, if available.
  11. Select the Type of Premises: Residential, Commercial, Industrial, or Agriculture.
  12. Choose the Type of Connection: Single Phase, Three Phase, Underground, or Overhead.
  13. Select the nature of services: New Connection, Load Extension, or Reinforcement.
  14. Fill in the Load & Area Requirement details.
  15. Complete the Customer’s Declaration section and provide a signature with the date.
  16. Gather all required documents as listed in the form.
  17. Submit the form and documents at the designated KESC office.

Get Answers on K Electric New Connection

What is the purpose of the K Electric New Connection form?

The K Electric New Connection form is designed to facilitate individuals and businesses in Karachi seeking to establish a new electricity supply connection. By completing this form, applicants provide essential information about themselves and the connection requirements, allowing K Electric to assess and process the application efficiently.

Who can apply for a new electricity connection?

Any individual or business entity in Karachi can apply for a new electricity connection, provided they own the property where the connection is desired. This includes residential, commercial, and industrial applicants. Make sure all documents are in order for a smooth application process.

What documents are required to submit with the application?

When submitting your application, you'll need to include several key documents:

  1. Copy of CNIC of the owner
  2. Passport-size photograph of the applicant
  3. Copy of registered ownership documents
  4. Copy of the approved building plan (if applicable)
  5. Copy of the covering letter of the approved plan/layout
  6. In case of Kachi Abadis, include an affidavit
  7. Copy of a trade license (if applicable)
  8. Last paid energy bill (only for load extension)
  9. Authority letter of owner (if applicable)
  10. Details of machinery/equipment for industrial cases
  11. Feasibility report for industrial consumers
  12. Any other paid utility bill for address verification

All original documents must be available for verification during application submission.

Is there a fee to apply for a new connection?

No, the application form for a new electricity connection is free of cost. However, all payments related to the service connection must be made at KESC's authorized banks. Keep this in mind when planning your application process.

How long does it take to process the application?

The processing time for a new connection can vary based on several factors, such as the completeness of the application and the current workload of K Electric. Generally, applicants can expect to receive updates within a few weeks. For more precise timelines, contacting K Electric directly may be helpful.

What types of connections can I request?

The K Electric New Connection form allows applicants to choose from various types of connections such as:

  • Residential
  • Commercial
  • Industrial
  • Agricultural

You can also select the type of connection, including single-phase, three-phase, underground, or overhead, depending on your requirements.

Are there specific regulations I need to comply with?

Yes, upon signing the form, applicants agree to adhere to all rules and regulations set forth by K Electric and applicable laws under the NEPRA Act. It's crucial to review these conditions to avoid any issues during or after the connection process.

How can I contact K Electric for more assistance?

If you have questions or need further assistance, K Electric is accessible via phone at 118. You can also reach out through email at [email protected] for specific inquiries related to new connections or application submissions.

Common mistakes

When individuals fill out the K Electric New Connection form, some common mistakes can lead to delays or complications in processing their applications. Recognizing these errors can help ensure a smoother submission process.

First, many applicants fail to use capital letters throughout the form, as specifically instructed. Using lowercase letters can create confusion and may make it difficult for processing staff to read the responses. This minor oversight can hinder the progress of the application significantly.

Another frequent mistake involves incorrect personal information. Many people will mistakenly enter their CNIC number incorrectly or provide outdated validity information. It cannot be stressed enough how important it is to double-check this data for accuracy.

Some applicants forget to attach the required photographs, which can lead to their application being returned or rejected. Including a recent passport-sized photo is crucial for the identification process and is a requirement outlined in the submission guidelines.

Additionally, people often neglect to provide documentation needed for their connection type. Each connection type—residential, commercial, or agricultural—has specific document requirements outlined on the form. Missing these documents can lead to delays in processing the application.

Another common oversight is not marking the correct type of connection. Many individuals fail to clearly indicate whether they need a single-phase or three-phase connection. This ambiguity leads to confusion and potential mismatches in service provision.

Moreover, applicants frequently mishandle the section asking for load requirements. This section needs precise information about the total load required in kilowatts (KW). Providing either too little detail or incorrect figures can result in inadequate service or additional processing delays.

Some people mistakenly assume they can submit the application without original documents. The guidelines state that original documents must be presented alongside their photocopies. Failing to comply with this requirement can hold up application processing.

Additionally, applicants sometimes overlook providing a contact person profile in optional sections. While it is optional, including this information can aid in effective communication between K Electric and the applicant if any issues arise.

Finally, many individuals ignore reviewing the terms and conditions at the end of the form. Understanding the agreement they enter into, including charges and regulations, is crucial before signing and submitting the application. A lack of awareness might lead to unexpected charges later.

In conclusion, awareness of these common mistakes can immensely benefit individuals looking to obtain a new connection with K Electric. By carefully reviewing the form and adhering to the requirements, applicants can minimize complications and expedite the process.

Documents used along the form

When applying for a new electricity connection with K Electric, several additional documents may be required. These forms help streamline the application process and ensure that all necessary information is provided. Below is a list of common forms and documents used alongside the K Electric New Connection form, along with a brief description of each.

  • Copy of CNIC of the Owner: This document serves as proof of identity and must be submitted for verification purposes.
  • Passport Size Photograph: A recent photograph of the applicant is required for identification on the application.
  • Registered Ownership Documents: Proof of ownership for the property where the electricity connection is being requested is essential.
  • Approved Building Plan: If applying for a multi-storey building, a copy of the approved building plan must be included.
  • Trade License: For commercial connections, a copy of the trade license may be necessary to validate the business operation.
  • Authority Letter: If someone other than the owner is submitting the application, an authority letter granting permission is required.
  • Last Paid Energy Bill: For extensions of load, a copy of the last energy bill paid is needed to confirm the existing connection.

Ensuring that all these documents are in order can help to expedite the application process, making it easier for K Electric to process your request efficiently. Proper preparation can pave the way for a smoother experience in obtaining your electricity connection.

Similar forms

  • Residential Lease Agreement: Similar to the K Electric New Connection form, this document requires personal information from the applicant, such as name and identification number, along with details about the residence that will be rented.

  • Water Utility Connection Application: This application form collects similar information, including the applicant's basic personal details and the address where water service is required. It often requires proof of ownership or a lease.

  • Gas Service Application: Like the K Electric form, this document requests the applicant’s identification details and contact information. It also specifies the type of service required and often includes a declaration of agreed terms.

  • Insurance Policy Application: This type of application shares the requirement for personal information of the applicant, as well as details about the property or item to be insured, paralleling the need for identification and residency proof in the K Electric form.

  • Home Ownership Transfer Documents: These documents collect similar details about the owner's identity and property location. They require proof of ownership, which is also a necessity in the K Electric New Connection application.

  • Bank Account Opening Application: This form demands personal identification information and contact details from the applicant. Applicants are also required to provide verification of residence, akin to what is needed for the electricity connection application.

Dos and Don'ts

When filling out the K Electric New Connection form, certain practices can help improve accuracy and efficiency. Conversely, there are also common pitfalls to avoid. Here’s a list of dos and don’ts to guide you:

  • Do fill out the form in capital letters to ensure clarity.
  • Do double-check all personal information for accuracy, including CNIC numbers and contact details.
  • Do provide all required documents as specified on the form.
  • Do read the entire form carefully before submission to understand all requirements.
  • Do ensure that your photograph is current and meets the specified size requirements.
  • Don’t leave any fields blank if they are required; this may delay the processing of your application.
  • Don’t submit photocopies of documents without bringing the originals for verification.
  • Don’t ignore the need for a signed declaration at the end of the form; it’s crucial for processing.
  • Don’t provide outdated contact information, as this could lead to missed communications.
  • Don’t rush through the form. Take your time to review all entries to minimize errors.

Misconceptions

  • Misconception 1: The K Electric New Connection form requires a fee.
  • This form is free of cost. All payments related to the connection must be made only at authorized banks designated by K Electric.

  • Misconception 2: Documentation is optional for the application.
  • Applicants must submit specific documents, such as a CNIC copy, a photograph, and ownership documents, among others. Failure to provide the required documentation can lead to delays or rejection of the application.

  • Misconception 3: The connection types are limited.
  • The form accommodates various connection types, including residential, commercial, industrial, and agricultural. Applicants can select from single phase, three phase, underground, and overhead connections.

  • Misconception 4: All fields in the form need to be filled in.
  • While most fields must be completed, some sections allow for optional information, like the contact person profile, which can simplify the application process if not necessary.

  • Misconception 5: Connections cannot be changed once established.
  • The application form provides options for load extensions and reinforcements, indicating that changes can be made to an existing connection.

  • Misconception 6: The application process is uniform across all types of connections.
  • Different connection types have distinct documentation requirements and procedures. For example, industrial connections may require additional information, such as a feasibility report and details of machinery.

Key takeaways

When filling out the K Electric New Connection form, understanding the requirements and following the outlined instructions is crucial. Here are key takeaways to keep in mind:

  • Owner's Information: Clearly fill in your name, CNIC number, and other personal details. Ensure that all information is accurate and written in capital letters.
  • Photograph Requirement: Don’t forget to paste a recent passport-size photograph in the designated area on the form.
  • Contact Details: Provide comprehensive contact information, including your email address and multiple phone numbers (residence, office, and mobile).
  • Connection Specifications: Indicate the type of connection you require, such as single-phase or three-phase, and specify if it's a new connection, load extension, or reinforcement.
  • Declaration: Review and agree to the terms outlined in the customer’s declaration section, confirming authenticity and acceptance of charges.
  • Document Submission: Prepare all required documents, including a copy of your CNIC, ownership documents, and any relevant licenses or certifications.
  • Cost Clarification: Remember that the application form is free of charge, but payments for the service must be made at authorized banks only.
  • Submission Location: Find the appropriate KESC office for submission based on your connection type, such as residential or industrial.
  • Original Documents: Present original documents along with photocopies for verification during the application submission process.

By following these guidelines and ensuring all information is correct and complete, the process of applying for a new electricity connection can proceed smoothly.